Getting your property ready for pour day
By ConcreteFinder Research TeamPublished 9 min read
Pour day goes smoothly when 4 things are settled before the truck is booked. Someone has requested the utility locates. The concrete has a way from the street to the forms. The old driveway has somewhere to go. And anything on the City's side of the property line has a permit. Each one can add a line to the quote.
Who requests the utility locates, and how early?
The person doing the digging requests the locates, and the dig waits until every answer is in. Ontario One Call now operates as Ontario Dig Authority. Its public utility locates page says that anyone "planning a larger excavation project" must "request a public utility locate before you dig". It adds: "It's free, it's easy, and it's the law."
The same page asks for at least 5 business days' notice before a single-address project. A driveway replacement digs out the old base, so it counts. The page says "The person performing the excavation should submit the locate request". If you have hired a contractor, it tells you to confirm they have submitted the request and received all responses before excavation begins. Locators, the technicians each utility sends out, mark the buried lines. The page asks you to keep those markings visible and to request a new locate if the project changes.
The public locate stops at lines the utilities own. Ontario Dig Authority says you must arrange a private locate for lines you own. Its examples include:
- gas lines to barbecues or pool heaters
- electrical lines to sheds, detached garages, lights or signs
- sewer and septic systems
A lamp post beside the driveway or a cable to a garage falls in that list. Tell the crew where you know one runs, and ask who books the private locate.
Can the ready-mix truck reach the forms?
Whether the truck can reach the forms decides whether a pump goes on the quote. The supplier 2AZ Group sells ready-mix and rents equipment. It describes a pour with no rear access that needs a boom pump, and calls that "$1,500 you don't need if the truck can back up to the forms."
Nice Guy Concrete's 2026 Ontario page says "Limited access for concrete trucks may require pump truck ($500-1,500 extra)". Rockit Concrete Pumping gives $500 to $1,200 per day for a line pump, a small pump that pushes concrete through a hose. On 2AZ Group's list, a trailer-mounted line pump is $800 to $1,200 per half-day.
Rockit's page also says what a customer should prepare. Its answer is to "clear a path for the hoses, ensure there is a water source available for priming the pump". In practice that can mean a working outdoor tap, an unlocked side gate and a clear path.
Canada Building Materials' GTA ready-mix price list says "60 minutes per load will be allowed for unloading" and charges extra time at $120 an hour. That suggests the forms, crew and path should be ready before the truck turns into your street. Who pays for waiting time is a fair question for the quote.
Where does the old driveway go, and is removal in the price?
Removal is a real cost, sometimes inside a per-square-foot rate and sometimes a separate line. Nice Guy Concrete's page says its per-square-foot prices "include removal of existing surface, excavation, base preparation, concrete, and finishing". RenovateIndex.ca's Toronto guide prices excavation and base preparation as one line, and notes that it "Includes removal of existing surface and compacted granular sub-base". The sub-base is the packed gravel layer under the slab.
Most of the figures below come from companies that sell the work, the equipment or the concrete. Read each as that company's own published price, not as a Toronto average.
| Pour-day line | Published figure | Who publishes it |
|---|---|---|
| Removing an old asphalt driveway | $2 to $3 per square foot | Nice Guy Concrete |
| Removing an old concrete driveway | $3 to $5 per square foot | Nice Guy Concrete |
| Excavation and base preparation, removal included | $800 to $1,500 per project | RenovateIndex.ca |
| Waste bin, 6-yard | $350 to $450 | 2AZ Group |
| Waste bin, 40-yard | $700 to $1,000 | 2AZ Group |
| Line pump | $500 to $1,200 per day | Rockit Concrete Pumping |
| Truck time past 60 minutes of unloading | $120 per hour | Canada Building Materials |
The bin prices on 2AZ Group's page "include delivery, pickup, and disposal for standard construction waste". The page adds that "Clean concrete fill is cheaper" and "Mixed waste with prohibited items costs more." So keep the bin for the old driveway. Where it sits decides whether you need a permit.
Does anything need a City permit on pour day?
In Toronto, yes, if a bin, mixer or pump sits beyond your property line. The City of Toronto's Street Occupation Permit page says you need one to "temporarily occupy the area beyond your property line (the boulevard, sidewalk, roadway or public lane)". The boulevard is the strip between your property line and the road. The page's list of items that need the permit includes "Disposal bin in roadway or public laneway" and "Pumping of concrete and concrete mixer".
The page says permits "must be obtained in person and must be paid for when they are issued". The fee depends on the type of permit and how long the work lasts. Closing a street, sidewalk or lane also needs a letter explaining the closure, with a proposed work schedule. Ask the contractor in writing who applies and who pays. The pages checked for this guide cover Toronto only, so outside the city, ask your own municipality.
Widening a driveway, cutting a curb or building a parking pad brings separate rules. The guide to driveway replacement permits and timing covers those.
What should you move, clear and tell the neighbours?
Move the cars, clear the truck's path and give the neighbours the date and the hours. Your own car has to be out before the tearout starts. It stays out until the new slab can carry it, and the guide to booking concrete work in Toronto sets out how long that takes. If you share a driveway, your neighbour's car is stuck too, so agree on parking before you book.
Start time is set by a bylaw, not by the crew. The City of Toronto's noise page lists "applying concrete" as construction noise. That noise is not allowed if clearly audible at these times:
- Monday to Friday, 7 p.m. to 7 a.m. the next day
- Saturday, 12:01 a.m. to 9 a.m. and 7 p.m. to midnight
- Sundays and statutory holidays, all day
The page says these rules are "Subject to exemptions under an approved Noise Exemption Permit." A Saturday pour therefore cannot start making noise before 9 a.m.
Which driveway crews do reviewers say leave a clean site?
The index cannot tell you who will leave your yard clean, but it does record what reviewers keep saying. ConcreteFinder's Concrete Driveways category holds 140 listings (137 companies once branches sharing a phone number are folded together). The site reads each company's stored Google reviews and tags what its methodology calls "themes reviewers keep repeating". Counts for the themes that touch pour day, among the 140:
- a clean, tidy worksite: 44 companies
- arriving on time: 52 companies
- respect for the property: 21 companies
- either a clean site or respect for the property: 60 companies
A theme comes from what customers wrote, not from an inspection, and a missing theme proves nothing. Read the themes as a prompt for questions.
The Google labels add another clue. The whole index holds 7 records labelled Excavating contractor and 6 labelled Demolition contractor, and none of the 13 is in the driveway category. So a label will not tell you who does the tearout. The website text the site stores says a little more: 18 of the 140 driveway listings mention excavation there, counting any word that starts with "excavat". The stored text is an excerpt, so a company may say more on its full site. Ask whether the driveway crew does the tearout or hires it out.
What should the written quote say about pour day?
The quote should answer every pour-day question before you sign. These are the ones this guide raises:
- Who requests the public locate, and who books a private locate for lines you own?
- Can the truck reach the forms, or is a pump included? Which kind, and at what price?
- Is removal of the old surface in the price, and where does the waste bin sit?
- Does a bin, mixer or pump need a Street Occupation Permit, and who applies?
- What time will work start, given the City's noise hours?
- If the truck waits past its unloading allowance, who pays?
- How will the fresh slab be protected, and when can you use it?
For the rest of a complete quote, see how to choose a concrete contractor in Toronto. The concrete driveway cost guide has the full price table, and the methodology page explains how companies are ordered.
Frequently asked questions
Do I need utility locates before a driveway replacement?
Yes, if anyone digs. Ontario Dig Authority says a locate is required before digging whether you do the work or hire someone. It is free, and a single-address request is completed within 5 business days. The person doing the excavation should submit it. If a contractor digs, confirm in writing that every response has come back before work starts.
How much does a concrete pump add to a driveway quote?
It depends on who prices it, and each figure here comes from a company that sells the work. Nice Guy Concrete's page says limited truck access may need a pump truck at $500 to $1,500 extra. Rockit Concrete Pumping gives $500 to $1,200 per day for a line pump. On 2AZ Group's list, a trailer-mounted line pump is $800 to $1,200 per half-day.
Can a concrete crew start at 7 a.m. on a Saturday in Toronto?
Not if the work can be clearly heard. The City of Toronto's noise page counts applying concrete as construction noise and bars it on Saturdays from 12:01 a.m. to 9 a.m. and after 7 p.m. On weekdays the quiet period runs from 7 p.m. to 7 a.m. Sundays and statutory holidays are covered all day, unless the City has approved a Noise Exemption Permit.
How many concrete driveway companies does ConcreteFinder list near me?
The site's Concrete Driveways category holds 140 listings across the Greater Toronto Area, 137 companies once branches sharing a phone number are folded together. By the area field on each record, Etobicoke has 22, North York 18 and Brampton 15. Those counts follow where a company is listed, not where it will work, so ask each one about your street.
Sources
Every figure in this article is either counted from ConcreteFinder's own index of Greater Toronto Area concrete companies or copied from one of the pages below, which is named in the sentence that uses it.
- ConcreteFinder, How ConcreteFinder ranks companies (methodology, updated 20 August 2026)
- Ontario Dig Authority (formerly Ontario One Call), Public Utility Locates (notice period, private locates, digging at home)
- City of Toronto, Street Occupation Permit (bins, concrete pumping and mixers beyond the property line)
- City of Toronto, Noise (construction noise hours)
- Nice Guy Concrete, 2026 Concrete Driveway Cost Ontario (removal costs, pump truck)
- RenovateIndex.ca, Concrete Driveway Cost in Toronto (excavation and base preparation)
- 2AZ Group, The Real Cost of Concrete Work in the GTA in 2026 (bins, pump rates, site access)
- Rockit Concrete Pumping, Line Pump Toronto (daily rate, site preparation)
- Canada Building Materials, 2026 GTA Region Price List for General Contractors (unloading time)
Related reading
How ConcreteFinder is paid, and who wrote this
This guide was researched and written by the ConcreteFinder Research Team, published on November 16, 2026. Every figure above was re-opened at the page it came from on the day this went live, and each one names that source in the sentence that uses it. Every Greater Toronto Area concrete business on this site is listed free, and no company can pay for a position in the rankings or for a mention in an article. What ConcreteFinder does and does not charge for is set out on our page for contractors, and money is kept apart from the rankings on purpose. The ranking formula is published in full on our methodology page, and if a figure here is wrong we would rather hear about it, through contact.
Compare Greater Toronto Area concrete companies
No obligation. Your details go to one contractor, never to a list or a broker.